Did a little more work on tractor this weekend. Battery hold downs completed, guess it looks ok? Cut hole for fuel gauge sending unit, welded bolts in to secure it. Welded the back side of tank to bent piece. Have a couple othe tabs to make to attach it to the frame yet. Once I get filler hole for fuel and the return line and drain figured out I'll weld on the front of tank.